Height Safety Engineers

Fairfield Project

Fairfield Project

We were contacted by this client very late in their project. They had not considered their roof safety equipment and it was classified as an urgent job.

We provided a design an installed within 4 days. This is not always achievable or advisable but we strive to provide solutions for our clients. The job comprised of:

  • 65m Aluminium Walkway.
  • 3m fold down hand rail.
  • Access to 3 lower roofs.
  • 3 sided handrail at hatch.
  • Anchor points.

If you need assistance with current or future projects. Please get in touch.

No one plans to fall! If in doubt, ask!!!

               

Request a Quick Quote